Trace downtime events
Collect maintenance tickets, shift notes, throughput history, duration and repair costs. Separate planned maintenance from failures and record when another line absorbed the work.
Test a capacity assumption
A fictional packaging line loses six hours per month unexpectedly. At 140 units per hour, that exposes up to 840 units of nominal production. Check whether overtime or spare capacity actually recovers those units.
Model operating response
Price backup capacity and upcoming repair work, then test how a longer outage would change delivery and cash. Assign post-close monitoring to an operating owner.
Buyer Checklist
- Identify the constrained asset
- Reconcile event records
- Check recoverable volume
- Estimate backup capacity
Frequently Asked Questions
Is lost production the same as lost sales?
Check how much demand was deferred, recovered, or canceled before valuing the financial effect.
This guide is educational and does not replace transaction-specific legal, tax, accounting, lending, insurance, or valuation advice from qualified professionals.